A flow rate and micron rating are a starting point. Specify filtration around contamination, operating conditions and maintenance needs.

Industrial filtration often enters a project as a short list of requirements: flow, pressure, temperature and a target particle size. Those values are useful, but they do not fully explain the duty.
A specification should also describe what the filter needs to protect, which contaminants are present and how the plant will operate over time. Bringing these details into the project early gives engineering teams a stronger basis for comparing solutions.
Start with the downstream requirement. Is the priority equipment protection, liquid separation, product cleanliness or a combination of duties? Describe the required separation performance clearly enough that suppliers can explain how their proposal will be assessed.
Then document the operating range. Normal conditions alone may miss the periods that put the greatest load on the filtration system. A useful supplier discussion should cover start-up, changes in throughput and any known variation in contaminant loading.
Space and access should be discussed alongside process performance. Ask how elements will be removed, how the housing will be isolated and what happens to production during maintenance. These questions help make proposals comparable beyond their purchase price.
For liquid-liquid coalescers, Cleanova also recommends assessing differential pressure at actual flow, temperature, viscosity and liquid-loading conditions. Its guidance distinguishes clean and operating pressure drop from alarm, change-out and maximum allowable limits. That distinction helps explain how equipment is expected to behave in service.
An existing vessel does not always need replacing when capacity increases. In a published offshore seawater-injection case, Cleanova describes an element upgrade supporting an increase from 75,000 to 110,000 barrels per day without enlarging the vessels or footprint.
That result is specific to the reported application. Its value for other projects is the question it raises: has the existing installation been evaluated against the new requirement before a larger replacement is assumed necessary?
A productive first enquiry combines process conditions, contamination information, downstream requirements and practical constraints. Where information is missing, identify it explicitly so the next step can be agreed.
Oranjeberg helps customers develop these application requirements and coordinate the discussion with Cleanova’s filtration engineers, supporting informed selection for new projects and existing assets.
Preparing a filtration specification or plant upgrade? Get in touch with Oranjeberg with your process data and project requirements.